Studies

Installation of scrubbers
A study on the installation of scrubbers would assess the feasibility and cost of installing scrubbers to reduce air pollution emissions from a vessel.
Mooring and towing arrangements
This study would assess the vessel's mooring and towing arrangements to ensure that they are suitable and safe for the intended operations.
Dangerous goods
A study on the handling of dangerous goods would assess the vessel's capacity to safely store and transport such goods in compliance with international regulations.
Draft increase
A study on draft increase would assess the feasibility and implications of increasing the vessel's draft to enable it to carry more cargo or comply with new regulations.

Structural modifications & reinforcement
This study involves the assessment and design of structural modifications and reinforcement to a vessel. These modifications may be necessary to support new equipment, accommodate increased loads or draft, or comply with new regulations.
Installation of ballast water treatment
A study on the installation of ballast water treatment systems would assess the feasibility and cost of installing such a system to comply with international ballast water regulations.
Installation of AMP
A study on the installation of an Alternative Maritime Power (AMP) system would assess the feasibility and cost of installing such a system to reduce emissions from a vessel while it is at berth.

Electrical load analysis
This study would assess the electrical load requirements of the vessel to ensure that the vessel's electrical system can support all necessary equipment and system in the most optimum way.
Steam balance
A study of optimization on steam balance would assess the balance between the steam generated and consumed on board a vessel to ensure that there is sufficient steam available to power all necessary systems.
Causation analysis
This study would assess the cause of a particular incident or event on a vessel, such as an accident or equipment failure, in order to identify the root cause and take appropriate measures to prevent future incidents.